S45 · E11
Lexington: Electrical Bond
Copper bonding is installed before the therapy pool is craned in; tile selections are revealed; the integrated entrance ramp gets snow melt and a final layer of concrete; elevator disconnects are installed.

No video is available for This Old House — Lexington: Electrical Bond yet.
S45 · E11
Copper bonding is installed before the therapy pool is craned in; tile selections are revealed; the integrated entrance ramp gets snow melt and a final layer of concrete; elevator disconnects are installed.
Oct 26, 2023 · 27m