S35 · E14
Arlington 2014: Part 6: Additional Details
The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.

No video is available for This Old House — Arlington 2014: Part 6: Additional Details yet.
S35 · E14
The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.
S35 · E05
Nov 2, 2013